Zhuzhou major Wet electrostatic precipitator Installation requirements a. The foundation of the fan shall be level and solid, and the foundation height shall be ≥ 200mm. b、 The fan and air duct shall be connected by flexible hose (flexible material and non combustible), the length shall not be less than 200mm, and the pipe diameter shall be the same as the inlet and outlet size of the fan. In order to ensure that the hose will not be twisted or deformed during the system operation, it should be installed with appropriate tightness. The canvas hose installed at the suction end of the fan can be slightly tightened to prevent the fan from being sucked in during operation and reduce the sectional size of the canvas hose. c、 Wet electrostatic precipitator company The steel support of the fan must be fixed on the concrete foundation, and a rubber damping pad must be added between the steel support of the fan and the foundation. All fan and motor components are installed on the whole steel support, and the steel ground frame is installed on the damping pad at the top of the foundation. The damping pad is preferably made of perforated rubber plates. d、 The pipe diameter at the outlet of the fan can only be increased, but not decreased. At the end of the outlet, an insect screen should be installed. When the fan is inclined to the upper outlet, a rain cap should be added

Main working principles of wet electrostatic precipitator: major Wet electrostatic precipitator Spray the water mist to the discharge electrode and corona area. The water mist will split and further atomize after being charged in the powerful corona field formed by the barbed electrode. The collision interception, adsorption and coagulation of electric field force and charged water mist will jointly trap the dust particles. Finally, the dust particles will reach the dust collecting electrode and be trapped under the drive of electric field force. The water forms a continuous water film on the dust collecting electrode, and the captured dust is washed into the ash hopper and discharged with water. Operating principle of wet electrostatic precipitator. The dedusting process of electrostatic precipitator can be divided into four stages: gas ionization; The dust is charged with ions; Charged dust moves towards the electrode; Remove the dust on the electrode. Only the objects removed by wet electrostatic precipitation are dust and droplets, but their working principles are different due to the differences in physical characteristics between droplets and dust. In principle, Zhuzhou Wet electrostatic precipitator First of all, the existence of water droplets has an impact on the electrode discharge. To form emitting ions, free electrons in the metal electrode must obtain enough energy to overcome the ionization energy and cross the surface barrier to become emitting electrons. It is an effective measure to reduce the surface barrier by bringing water on the electrode surface. After the metal surface is covered with water, the original "metal air" interface is divided into "metal water" interface and "water air" interface. The potential barrier of the latter two interfaces is much lower than that of the former interface. In this way, after the metal surface is filled with water, the original high barrier will be divided into two low barriers, which will greatly weaken the blocking effect of the surface barrier on free electrons and make electrons easy to launch. In addition, Wet electrostatic precipitator company Under the action of electric field, various impurity ions in water can easily cross the surface barrier and become emission ions. All of these have changed the electrode discharge effect, enabling corona discharge under low voltage. Secondly, due to the existence of water droplets, the resistance of water is relatively small. When water droplets combine with dust, the specific resistance of dust with high specific electricity decreases, so the working state of wet electrostatic precipitator will be more stable; In addition, since the wet electrostatic precipitator is washed by water flow and has no rapping device, it will not produce secondary dust.

Among all kinds of mechanical and electrical equipment in all walks of life in China, the motors matched with fans account for about 60% of the installed capacity of national motors, and the power consumption accounts for about one-third of the total power generation in China. In particular, Wet electrostatic precipitator company Most fans have the phenomenon of pulling a cart from a horse during use. In addition, due to changes in production and technology, it is necessary to frequently adjust the gas flow, pressure, temperature, etc; Many units still adopt the backward way of adjusting the opening degree of the wind shield or valve to adjust the gas flow, pressure, temperature, etc. In fact, this is to meet the requirements of process and working conditions for gas flow regulation by artificially increasing resistance at the cost of wasting electric energy and money. This backward regulation mode not only wastes valuable energy, but also has poor regulation accuracy, which is difficult to meet the requirements of modern industrial production and services, and has serious negative effects. With the continuous improvement and development of frequency conversion technology in recent ten years. The performance of variable frequency speed regulation is becoming increasingly perfect, major Wet electrostatic precipitator It has been widely used in AC speed regulation in different fields. It has brought considerable economic benefits to enterprises and promoted the automation process of industrial production.

3. When installing Type C and Type B, ensure that the two pulley positions are on the same plane, and the flatness tolerance is 0.5mm. 4. When installing Type D, use a dial indicator and feeler gauge to measure the coaxiality of the fan spindle and motor spindle and the parallelism of both ends of the coupling. The coaxiality tolerance of two shafts is 0.2mm, the parallelism tolerance of both ends of the coupling is 0.2mm, and the spacing between two planes of the coupling is 5 to 8mm. 5. After the fan is installed, move the rotor with hand or lever to check whether it is too tight or collided. The test run can be carried out without overtightening or collision. 6. After the motor is installed, the belt pulley or coupling guard shall be installed. If the air inlet is not connected to the air inlet pipe, the guard net or other safety devices (provided by the user) shall also be provided. 7. Other parts shall be installed according to the corresponding positions in the drawing. 8. Add N46 (ISO VG46, 30) in summer and N32 (ISO VG32, 20) in winter. The oil level should be at 1/2 of the oil window.