夜上海论坛

Welcome to the official website of Changsha Zengxiang Environmental Protection Equipment Co., Ltd!

Environmental protection equipment R&D and customized manufacturers

Solution provider for wet electrostatic precipitator production line

Service hotline:

139-0846-1664

173-7307-8768



 Wet electrostatic precipitator
Your current location: home page > Hot information

contact us Contact Us

Changsha Zengxiang Environmental Protection Equipment Co., Ltd

Telephone: one billion seven hundred and thirty-seven million three hundred and seven thousand eight hundred and seventy-six 8/ fifteen billion eight hundred and seventy-four million eight hundred and seventeen thousand seven hundred and twenty-four

Email: [email protected]

Website: autoboty.cn

Address: Jinlong Industrial Park, Jinlong Avenue, Xiangyin, Yueyang, Hunan


Tongling professional electrostatic wet precipitator manufacturer

2023-03-29
 Tongling professional electrostatic wet precipitator manufacturer

Before installation, first prepare the materials and tools for installation, and check the parts of the fan, especially the impeller, main shaft, bearing and other parts. If any damage is found, repair it, and then clean the inside of the bearing box with kerosene. In the process of installation, the following points must be paid attention to: 1. In order to prevent rust and reduce the difficulty of disassembly, some grease or machine oil should be coated on some joint surfaces. 2. When installing the bolts on the joint surface, if there are positioning pins, install the pins and tighten them before tightening the bolts. 3. Check that there should be no tools and sundries falling or left in the casing and other casings. Installed and used by CHANG factory bridge QIAO ISO9001 quality management system certification enterprise of Beijing No. 2 Blower Works 1. When installing the fan, the inlet and outlet must be provided with soft connection, and the weight of the gas transmission pipeline should not be added to the casing. Correct the gap size between the air inlet and the impeller according to the drawing, and keep the shaft in a horizontal position. 2. When installing the soft connection of the air inlet, the bolts of the air inlet itself can be directly used for connection. At this time, the air inlet is fixed by three countersunk screws.

 Tongling professional electrostatic wet precipitator manufacturer

Correct maintenance is an important guarantee for the safe and reliable operation of the fan and the improvement of its service life. Therefore, Electrostatic wet precipitator manufactor When using fans, full attention must be paid. Impeller maintenance: at the initial stage of impeller operation and during all regular inspections, whenever there is an opportunity, the impeller must be checked for cracks, wear, dust and other defects. The impeller must be kept clean whenever possible, major Electrostatic wet precipitator The steel wire brush shall be used regularly to remove the dust and rust on the impeller. As the travel time increases, the dust can not be evenly attached to the impeller, which will cause damage to the balance of the impeller and even cause rotor vibration. As long as the impeller is repaired, it needs to be dynamically balanced again. If possible, the portable trial dynamic balancing instrument can be used for on-site balancing. Before dynamic balancing, check whether all fastening bolts are tightened. Since the impeller has been operating in an unbalanced state for a period of time, these bolts may have become loose. Bearing maintenance: frequently check the oil supply of bearing lubricating oil. If the box leaks oil, tighten the bolts of the end cover a little. If this is not enough, you may have to use new sealing packing. When the bearing lubricating oil is in normal use, it should be replaced at least once every six months. When it is used for the first time, it should be done after 200 hours of operation. The second oil change should be done in 1 to 2 months. After that, the lubricating oil should be checked once a week. If the lubricating oil does not deteriorate, the oil change can be extended to 2 to 4 months. The specified brand of lubricating oil (specified on the general drawing) must be used when replacing, The old oil in the oil tank shall be completely drained and cleaned before new oil can be filled. If the fan bearing needs to be replaced, pay attention to the following matters: before installing the new bearing, the bearing and bearing box must be very clean. Place the bearing in the oil with a temperature of about 70~80 ℃ and heat it before installing it on the shaft. Do not force assembly to avoid damaging the shaft. Maintenance of other supporting equipment: see the respective user manual for the maintenance of various supporting equipment, including motors, electric actuators, instruments, meters, etc. These operating instructions are provided by each supporting manufacturer. The manufacturer will pack these instructions together and provide them to the user

 Tongling professional electrostatic wet precipitator manufacturer

Forecast from domestic market capacity. Tongling Electrostatic wet precipitator manufactor Fans vary greatly according to different pressure and flow requirements. Therefore, the fan demand should be differentiated according to its type and size, and predicted according to the demand of different industries. According to incomplete statistics, the annual average growth rate of national fan output was 13.8% from 1980 to 1996. major Electrostatic wet precipitator It is estimated that the total output of wind turbines in China will be 2.6 million to 2.9 million in 2005 and 3.1 million to 3.25 million in 2010. According to the statistics of fan industry over the years, it is predicted that the output of centrifugal compressors will be 1.6 million to 1.8 million in 2005 and 2 million to 2.1 million in 2010; The output of axial compressor is 260000 in 2005, and is expected to reach 360000 in 2010; The market share of turbine compressor and blower will reach about 70% in 2005

 Tongling professional electrostatic wet precipitator manufacturer

(3) The main faults and causes of the fan may occur during the operation of the fan. For the faults generated, the causes must be quickly identified and solved in time to prevent accidents. Faults in the Operation of 4-72-12 Centrifugal Fan and the Causes Table Fault Name Causes Severe Vibration of Bearing Box 1. The fan shaft is different from the motor shaft, and the coupling is installed askew. 2. The casing or air inlet rubs with the impeller. 3. The foundation stiffness is not enough or firm. 4. Impeller rivet is loose or wheel disc is deformed. 5. The impeller shaft disk and shaft are loose, and the coupling bolt is movable. 6. The connection between casing and bracket, bearing box and bracket, bearing box and seat is loose. 7. The air inlet and outlet pipes of the fan are poorly installed, causing vibration. 8. The rotor is unbalanced. Bearing temperature rise is too high 1. The bearing box vibrates violently. 2. The lubricating grease is poor in quality, deteriorated or overfilled, or contains dust, sand, dirt and other impurities. 3. The tightening force of connecting bolts of bearing cover seat is too large or too small. 4. The shaft and rolling bearing are installed askew, and the front and rear bearings are not concentric. 5. The rolling bearing is damaged. The motor current is too high and the temperature rise is too high. 1. The throttle valve in the air inlet pipe is not closed tightly when driving. 2. The flow exceeds the specified value, or the air duct leaks. 3. The gas density conveyed by the fan is too high. 4. The input voltage of the motor is too low or the power supply is cut off individually. 5. The coupling is improperly connected, the leather ring is too tight or the gap is uneven. 6. Affected by the violent vibration of the bearing box. 7. Affected by deterioration or failure of parallel fans. When the belt slides down, the two pulleys are not in the same plane with each other. Belt runout The distance between two pulleys is too close or the belt is too long.

 Tongling professional electrostatic wet precipitator manufacturer

Electrostatic wet precipitator manufactor Different types of dust remover equipment have their own precautions. When we usually use the dust remover equipment, we should tell my customer friends some application matters. What matters should we consider when using wet electrostatic precipitator? Matters needing attention on the application of wet electrostatic precipitator. 1. The wet electrostatic precipitator shall be put into the insulator chamber electric heating and hot air purging system at least 8 hours in advance to ensure that the temperature of the insulator chamber is more than 60 ℃. 2. The wet desulfurization system of the wet electrostatic precipitator is put into operation early to prevent dry and high-temperature smoke from entering the wet electrostatic precipitator, which will lead to scaling of internal parts and damage of internal anti-corrosion coating. three major Electrostatic wet precipitator The wet dust collector can be opened when the following three conditions are met together: 3.1 The wet electrostatic precipitator is operated with 25% of the oil gun remaining and 35% of the powder feeding is normal and stable or the oil gun is completely withdrawn. 3.2 The temperature of flue gas entering the wet electrostatic precipitator is lower than 70 ℃. 3.3 Desulfurization equipment has been opened. 4. The process of opening the wet electrostatic precipitator: first open the low-pressure water supply system and then the high-pressure power supply system.

Changsha Zengxiang Environmental Protection Equipment Co., Ltd

Address: Jinlong Industrial Park, Jinlong Avenue, Xiangyin, Yueyang, Hunan

Tel: 17373078768

fifteen billion eight hundred and seventy-four million eight hundred and seventeen thousand seven hundred and twenty-four

Email: [email protected]

Website: autoboty.cn




Copyright © Changsha Zengxiang Environmental Protection Equipment Co., Ltd. All rights reserved Record No.: Mainly engaged in Wet electrostatic precipitator , Wet electrostatic precipitator , Wet electrostatic precipitator Welcome to inquire! Service support:
Main business area: Hunan Jiangxi Guizhou Hubei